RAMS briefing record - Fictional completed example Prepared by: SSSTS Course Guide: https://www.ssstscourse.com/blog/site-supervisor-risk-assessments-method-statements EDUCATIONAL EXAMPLE ONLY All people, times, document references and project details below are fictional. This example illustrates communication, review and verification. It is not an approved safe system of work, risk assessment, method statement, traffic design, permit or instruction to carry out a delivery. It gives no safe route dimensions, barrier specification or signalling method. The linked blank record must be adapted to the employer's arrangements. Names here are dummy references. An attendance entry or signature is not proof of understanding, technical suitability or occupational competence. 1. TASK AND BRIEFING Record: DEMO-WG-BR-01 Project: Fictional Willow Gate refurbishment, Great Britain. Activity: Delivery of packaged materials beside an active work area. Limits: This record concerns a changed access interface and the associated briefing; it does not describe the full delivery method. Date: 11 November 2026 (fictional event). Briefer: Tara, fictional supervisor. Responsible manager: Lee, fictional manager assigned by the example employer. Initial task check: 08:10. Rebrief: 08:55. 2. DOCUMENTS AND MISMATCH Original document: WG-07, revision 2, issued 10 November 2026 in this example; authorised for use under the fictional employer's process before the new obstruction arose. Mismatch: The pedestrian entrance named in revision 2 is blocked by temporary storage. A suggested shortcut would enter the vehicle approach. Initial action: Tara pauses the affected delivery activity, explains the restriction and refers the changed condition to Lee. The crew does not use the suggested shortcut. Authorisation of the older document does not resolve this new site condition. The record remains open while the access arrangement is reviewed. 3. PRE-BRIEF QUESTIONS AND ACTION Question: Q01 — What authorised pedestrian access will apply while the stated entrance is unavailable? Affected activity: Delivery activity relying on the now-unsuitable access arrangement. Restriction: Keep that affected activity paused; do not improvise access through the vehicle approach. Action owner: Lee, who arranges review with the competent people responsible for the traffic/work interfaces. Target response: 08:30. Status at 08:30: Still open. The target time is not permission to start. Review scope recorded: Access, vehicle separation, adjacent work, resources and communication of the revised arrangement. The record does not perform that technical review or claim that Tara can authorise a new route merely because she delivers the briefing. 4. REVISED INSTRUCTIONS At 08:45, following competent review, WG-07 revision 3 is issued and authorised under the fictional employer's process. Change to explain: The revised access arrangement and its interface with the delivery and adjoining work. Document control: Revision 2 is withdrawn from this task's active briefing set. The employer retains its revision history under its record arrangements; the earlier event is not erased. Technical detail: Contained in the fictional revised method, not reproduced or invented in this educational record. 5. ATTENDANCE AND COMMUNICATION At 08:55, Tara briefs four fictional crew references: DEMO-A, DEMO-B, DEMO-C and DEMO-D. Each receives the task-relevant explanation of WG-07 revision 3 from a safe briefing location. The briefing identifies the current revision, the changed access, restrictions, handovers and the contact for an unexpected obstruction. Language support: No additional arrangement is assumed in this fictional case. In real use, arrange comprehensible information and suitable support where needed, and check the meaning has been understood. Later arrivals: Any person joining after this rebrief needs the relevant explanation and understanding check before joining the affected task. 6. UNDERSTANDING CHECKS Prompt: Describe your first step and the check before you begin. Recorded response: The team explains that the revised arrangement must be verified and the required restart decision given before the affected activity resumes. They identify the access described in the revised method from the safe briefing position. Prompt: Which control protects you or others, and how will you know it is in place? Recorded response: The team identifies the agreed separation and access arrangement described in revision 3 and explains that a clear path alone is insufficient if it conflicts with vehicle movements. The responsible people must verify the actual arrangement. Prompt: What change would make you pause, and who would you contact? Recorded response: A blocked route, conflicting vehicle activity or uncertainty about the revised instruction leads to a pause of the affected activity and contact with Tara, who escalates issues beyond her authority. Clarification: DEMO-B initially says to use the old entrance if the new access is busy. Tara explains that an improvised alternative is not authorised. DEMO-B describes the correct pause/report response on the follow-up check. No hazardous demonstration is used. 7. VERIFICATION, RESTART AND CLOSURE Before restart, the responsible people verify that the revised controls are in place and match the reviewed arrangement. The record refers to the actual check rather than treating a photograph or signature as sufficient evidence. At 09:05, Lee gives the restart decision under the fictional site's arrangements, after the revised controls and briefing have been checked. Q01 closure evidence: WG-07 revision 3 issued; access/interface issue resolved through competent review; four crew members rebriefed; clarification completed; physical controls verified; restart decision recorded. Q01 status: Resolved at 09:05 in this fictional example. At 09:20, Tara observes that the agreed access remains usable and the crew follows the revised arrangement. No new issue is recorded at that check. A later change would need fresh consideration; this observation is not a guarantee for the rest of the day. 8. WHAT MAKES THIS RECORD USEFUL - The mismatch is recorded before the affected delivery starts. - A named fictional owner and target time do not replace the required review. - The earlier revision remains identifiable and is withdrawn from active task use without destroying the history. - The briefing records actual understanding, including an initial misunderstanding and its correction. - Closure refers to resolved arrangements, verification and the authorised decision, not just attendance. Using this record Great Britain guidance; Northern Ireland has a separate CDM 2016 framework. Retain records under the organisation's applicable arrangements; this template does not set a statutory retention period.